The set up consists of a ½†bend and elbow, a sudden expansion & sudden contraction
fitting from 15mm to 25mm, ball valve and gate valve. Pressure tapings are provided at
inlet and outlet of these fittings under test. A differential manometer fitted in the line
gives pressure loss of individual fittings. Present set-up is self-contained water re-circulating
unit, provided with a sump tank and a centrifugal pump etc. Flow control valve and by-pas
s valve are fitted in water line to conduct the experiment on different flow rates.
Flow rate of water is measured with the help of measuring tank and stop watch.
Reliant Lab
All Rights Reserved.(Terms of Use) Developed and Managed by Infocom Network Private Limited. |